Cape Town & Saldanha · Western CapeMarine / Industrial / Workshop / Onsite
Naude Industries / Marine & Ship Repair
Workshop preparation · Vessel-side execution

Marine repairs. Built around the vessel.

Hull renewals, heavy marine fabrication, mechanical intervention and purpose-arranged access-coordinated around the real work front in Cape Town and Saldanha.

Hull repairsCrop, renew, weld and inspect
Marine fabricationHeavy plate and replacement components
Mechanical workWindlasses, fenders and operating equipment
Integrated accessScaffolding arranged around the repair
Connected ship-repair capability

The repair does not happen in isolation.

Marine work often requires access, removal, workshop intervention, fabrication and controlled reinstatement to move as one practical scope.

Naude Industries supports vessel owners, operators and contractors with responsive project teams backed by workshop capability. The examples below show completed work as well as honest condition-assessment projects where the final scope remained with the client.

Hull plate inserts
Weld preparation
NDT-ready repairs
Fender maintenance
Heavy plate replacement
Windlass assessment
Rigging coordination
Access scaffolding
Selected marine work

Real repairs. Documented clearly.

Project evidence selected to show the condition found, practical intervention and completed result where available.

Vessel-side scaffolding erected for hull plate renewal workHull plate inserts with visible NDT developer around welded perimetersScaffolding access to stainless steel plate repair over a mild steel vessel hull
Hull renewal · Access · Inspection

Hull plate inserts and repair access

Vessel-side scaffolding supplied and erected to provide practical access for hull plating work. Defective sections were cropped, prepared and renewed with welded inserts, followed by cleaning and non-destructive examination of the completed weld areas.

Access scaffoldingCrop & preparePlate renewalWeld & inspect
Completed replacement 35 millimetre marine plough plate with attachment detailsChamfer preparation on the original 35 millimetre plough plateOriginal twisted plough plate failing to align during onsite trial fit
35 mm plate · Adaptive fabrication

Marine plough plate replacement

The initial scope called for preparation and reinstatement of the existing 35 mm plate. After edge chamfering and mobilisation, the onsite trial fit confirmed that severe distortion prevented correct alignment. Following the client’s instruction, a complete replacement plate was fabricated with the required profile and attachment details.

Edge preparationOnsite trial fitFit-up assessmentReplacement fabrication
Marine fender units after tyre replacementSeverely worn and damaged tyres on marine fender unitsRemoved and replacement fender tyres staged on deck
Marine equipment · Onboard maintenance

Fender tyre replacement

Worn and damaged tyres were removed from multiple marine fender units. Replacement tyres were prepared, installed and secured using the fenders’ chain arrangements to restore the assemblies for continued service.

Condition reviewTyre removalReplacement fittingChain reinstatement
Twin-drum hydraulic anchor windlass in its received conditionHydraulic puller used during controlled windlass dismantlingFailed and deteriorated anchor windlass brake liningAnchor windlass stripped to its central housing and shaft
Mechanical assessment · Controlled dismantling

Anchor windlass strip-down and condition assessment

A twin-drum hydraulic anchor windlass was received for workshop dismantling and assessment. Port and starboard components were identified, seized parts were removed using hydraulic equipment, and inspection exposed extensive corrosion, failed brake linings and wear requiring further repair decisions.

Identify & markControlled dismantlingComponent inspectionCondition findings

This project is presented as dismantling and condition assessment only; no completed overhaul or operational test is claimed.

How projects are approached

From work front to controlled handover.

The exact path depends on the vessel, access, survey requirements and agreed client scope.

01

Assess

Review the condition, access, drawings, measurements and operational constraints.

02

Plan access

Arrange scaffolding, lifting, isolation and the practical work front.

03

Remove & prepare

Crop, dismantle, identify and transfer components for workshop work where required.

04

Repair or renew

Fabricate, machine, weld, assemble and prepare the item for service.

05

Inspect & reinstate

Complete agreed inspections, testing, installation and handover evidence.

Class attendance, third-party NDT, testing requirements, specialist rigging, removals in way and final acceptance criteria are confirmed for each project.